IYPS堆场智能策划系统
Gate receiving planning:
Build probability graph model based on historical data, dynamically calculate port by port, ton by ton, draw up site planning scheme, and optimize container storage status.
Shore unloading planning:
Based on the equipment information, task distribution, storage status, etC., and according to the principle of "decentralized and centralized", automatically allocate the site location for the unloading container.
Yard arrangement planning:
According to the management requirements of the storage yard area, the distributed storage plan shall be made for the scattered containers that need to be arranged in the storage yard, so as to improve the utilization rate of the site in the port.
Real time dynamic location allocation:
According to the container ownership information, combined with the planning and the current busy degree of the site, the optimal storage location is automatically calculated.
相关案例

